How the hourly rate is calculated
The rate is built from the top down. Work out everything the business must bring in — the income you want to take, your business expenses, and any profit you want to leave in the business — then divide it by the hours you can actually sell in a year.
- Billable weeks = working weeks − holiday weeks.
- Billable days = billable weeks × days worked per week.
- Billable hours = billable days × billable hours per day.
- Total required = desired annual income + business expenses + additional profit.
- Hourly rate = total required ÷ billable hours.
Worked example
You want £45,000 a year, work 48 weeks a year, take six weeks of holiday, work five days a week and can bill five hours a day. Business expenses are £6,000 and you want £4,000 of profit retained in the business.
| Step | Figure |
|---|---|
| Billable weeks | 48 − 6 = 42 |
| Billable days | 42 × 5 = 210 |
| Billable hours | 210 × 5 = 1,050 |
| Total required | £45,000 + £6,000 + £4,000 = £55,000 |
| Hourly rate | £55,000 ÷ 1,050 = £52.38 |
| Daily rate | £52.38 × 5 = £261.90 |
Dividing £45,000 by 2,000 hours instead gives £22.50 — less than half. That gap is the unpaid half of self-employment: holidays, admin, quoting, marketing, quiet weeks and sick days.
What counts as billable time
Billable hours are hours a client pays for. If you are at your desk for eight hours but two are spent on email, quotes and invoicing, you have six billable hours at best. Most freelancers can sustain four to six billable hours a day over a full year. Entering an optimistic figure produces an hourly rate that looks comfortable and does not survive contact with a real calendar.
Assumptions and limitations
- The result is before tax and National Insurance. It is what the business must invoice, not what you keep. Set money aside for tax as you invoice.
- It assumes every billable hour is filled. A rate that only works at 100% utilisation will fail in a quiet month — consider adding a buffer through the additional profit field instead of assuming full capacity.
- It excludes pension contributions, loan repayments and major equipment purchases unless you include them in expenses.
- It does not tell you what clients will pay. Use it as your floor, then test the market.
A day rate is not simply the hourly rate × 8. If you bill five hours a day, the day rate covers five billable hours — using eight would leave you short. For contractor-specific pricing, read how to calculate a contractor day rate.